Mirka’s glass sanding solutions - Better for the environment while saving you time and money
In 2018, Mirka France was training the Mont Blanc team on the top of the mountain, at an altitude of 3 842 m / 12 605 ft. Mirka provided an efficient, sustainable, and economic maintenance solution; instead of replacing the scratched glass panels, which would have to be brought in by helicopter, the team would sand and polish the glass panels on the spot.
The goal was to sand the glass on the glass walkway that leads to the “Step into the Void“- Aiguille du Midi Skywalk. This is a protective glass that is 8 mm thick. It is extremely complex to replace so instead the Compagnie du Mont Blanc preferred to sand and polish the glass to elimination scratches from, for example, shoes from visitors walking on the bridge.
"It was a challenging project," Christophe Pichon, Salesman, and Nicolas Vermorel, Technician, Mirka France, tell us.
Read more:
“It’s not easy to see at the altitude 3842m. There was also a lack of oxygen, the risk of altitude sickness, and the temperature of the glazing made it difficult.”